Bath
House Renovation, updated 4/14/2009:
Schematic Design
Cost Estimate and Site Plan Drawing
Pool Green
Roof Information (March 2009)
Posted September 29, 2008:
RFP
for bidding on Town of Somerset Pool Renovation:
Cover Letter
for Bidding & Revised Pool FDC
Plans to accompany November
RFP (document date June 25, 2008)
Posted 3/7/2008: Financial Planning Paper
Posted 2/15/2008:
Draft
Criteria
Plans
Tables
Discussion Procedures
New
Schematics (posted January 17, 2008):
Schematics Version 1: Pool -
includes renovation of existing bathhouse (posted 1-21-08)
Schematics Version 2: Pool -
new 1-story structure w/storm shelter that could be enclosed (this
scheme could be built for year-round use)
Schematics Version 3: Pool -
new 2-story structure with lart activity room, includes elevator and
2 stairs
Draft
floor plans (posted December 10, 2007):
Schematics Version 1
Site Plan
Pool, existing conditions
Pool, proposed improvements
Maintenance
Building, existing & addition
Posted
December 7, 2007:
Agenda for December 10 meeting
Space Requirements - Pool
(prelim)
Preliminary Estimates - Pool
Pool
& Town Proposal by Balodemas Architects (posted 8-25-07)(Some portions
redacted.)
Site
Plan Schematic (June 2007)
Posted April 20, 2007:
Pre-Design Phase 1 Executive
Summary
Pre-Design Phase Final Report:
Analysis & Evaluation of Proposed Improvements Swim Pool Bathhouse
and Town Hall (December 2006)
Pool Feasibility Report
Somerset Pool Study
Phase
II Options January 2007 |